The humble beginnings of L-Girder benchwork construction! Viewed: 173 times.
|
L-Girders and Keeper Joists glued and screwed in place, plus one leg! Viewed: 152 times.
|
All four legs now, with halfway-completed bracing. Viewed: 162 times.
|
| | |
| | |
|
|
|
|
| [640x427] [2560x1706] | [640x427] [2560x1706] | [640x427] [2560x1706] |
Plywood, with track-plan in marker (drawn earlier), is clamped into place atop the benchwork. Viewed: 156 times.
|
No Clamps! The plywood supported "beyond saw-blade height" on temporary risers. Viewed: 150 times.
|
Cutting plywood away to create the subroadbed Viewed: 158 times.
|
| | |
| | |
|
|
|
|
| [640x427] [2560x1706] | [640x427] [2560x1706] | [640x427] [2560x1706] |
Semi-completed subroadbed (looking East) Viewed: 164 times.
|
Semi-completed subroadbed (looking Northwest) Viewed: 156 times.
|
A wire coat hanger was the perfect tool to form the shape of subroadbed through the tunnel Viewed: 156 times.
|
| | |
| | |
|
|
|
|
| [640x427] [2560x1706] | [640x427] [2560x1706] | [640x427] [2560x1706] |
Wire coat hanger, showing the route through the tunnel from the lower level Viewed: 142 times.
|
Wire coat hanger, showing the route through the tunnel from the upper level Viewed: 140 times.
|
Transferring the tunnel route form from the coat hanger to plywood Viewed: 147 times.
|
| | |
| | |
|
|
|
|
| [640x427] [2560x1706] | [640x427] [2560x1706] | [640x427] [2560x1706] |
Cutting out the subroadbed for the tunnel route Viewed: 139 times.
|
Tunnel route subroadbed clamped in place for the final fitting (lower level) Viewed: 139 times.
|
Tunnel route subroadbed clamped in place for the final fitting (upper level) Viewed: 157 times.
|
| | |
| |
|
|
|